Setting Out

Reinforced concrete

From shutter setting out & checks and steel reinforcement QA to concrete penetrations, voids & upstands setting out, we have helped to deliver many succesful concrete pours.

Structures

We have experience setting out a wide array of structures including, but not limited to housing, high rise apartments, multi-storey carparks, bridges & culverts. We know how important it is to get it right at every step of the build process and take no liberties with setting out even when it comes to the higher tolerance stuff. Start right & end right. 

Steel frame & holding down bolts

AJS Engineering surveys only use total stations of 2″ angular accuracy or better – When it comes to floating bolts or just marking out for post fixed bolts, we like to make sure that when the columns go up or the pre fabricated units are dropped everything is where is
should be!

Earthworks

Experienced with profiling for roads & drainage, batter rails, and machine control, we can provide the right information to transform your site.

Roads

Front of kerb? Back of kerb? Which ever way you want it, we’ll tailor our setting out to your preferences. 

Drainage

Having a wide array of experience setting out for the infrastructure on many different kinds of projects, we can provide assistance in the construction of manholes, gullies, attenuation tanks, ponds & we’ll provide accurate gradients for your pipe runs. 

Take Action

Don’t risk costly errors or delays in your project. Get a free quote today and let us provide the precise, expert data you need to build with confidence.

What’s at Stake

Without accurate survey data, you risk delays, costly rework, and errors that can jeopardise your project’s success. AJS Engineering ensures reliable, precise data that keeps your project on track and helps you meet your goals.